Skip to main content
Glama

DC Hub — Data Center Site Selection & Colocation: Electricity, Power Grid, Gas, Fiber

Grid Transition Radar

grid_transition_radar
Read-onlyIdempotent

Forward-looking "where is the next hyperscale-friendly grid emerging" radar. Returns the US markets + ISOs with the strongest near-term emergence signal (BUILD verdict + excess-power headroom + short time-to-power), an ISO rollup, and a grid-headroom leaderboard. With a paid key, also the transition thesis: which ISO is opening up and why. The predictive counter to retrospective "where capacity landed" reports. Answers "where should I be looking next", "which market is about to become buildable". Try: grid_transition_radar max_months=24. Do NOT use for the current ISO queue snapshot (use get_interconnection_queue) or a present-day market ranking (use rank_markets); this is the forward-looking emergence radar.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
limitNoNumber of emerging markets to return
max_monthsNoMaximum acceptable time-to-power in months for the emergence signal, 1-120, e.g. 24

Output Schema

TableJSON Schema
NameRequiredDescriptionDefault
quotaNoCaller quota state (remaining calls, tier) when available.
_entityNoPayload class discriminator (e.g. facility|market|iso_grid|queue_results|deal|report|response) — branch on this before parsing the rest.
citationNoMachine-readable citation: how to attribute DC Hub (dchub.cloud) for this payload. Normally an OBJECT {source, url, license, cite_as, retrieved_at}; a bare string is accepted and carries the attribution line itself.
provenanceNoCollection-level provenance block: {source, method, as_of, verification_counts, cite_url_template, license, cite_as}. Quote the verification level when citing.
_front_doorNoIn-band front-door hint (first workflow-entry tool of a session): call plan_query(intent) first for the ordered multi-step plan.
_return_loopNoSuggested next-session delta call (get_changes since=24h) so you pull only what changed.
site_evaluation_handoffNoPre-built follow-up calls (analyze_site / get_water_risk args) when the payload carries coordinates — an array of {tool, parameters, why} entries.

Schema Changelog

Changes observed during successful MCP inspections. Dates show when Glama detected each change.

  1. First observed

TDQS

Score is being calculated.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

TSQS

Score is being calculated.